Trusted across NATO for 50+ years

The analytical foundation defence programmes trust, shown through the decisions it has supported.

Scope Real defence programmes in operation 
Domain Air, land, sea and space 
Reach Defence organisations in 30+ countries 
Track record Over 50 years 

Six programmes, six decisions

 

98.8%

Meeting the AMDR radar's availability requirement while keeping lifecycle costs under control

Read the story → 

More than $3 billion in F-35 sustainment cost savings identified

Read the story → 

100+ models, one long-term support commitment

Read the story → 

MKS-180: bidder life cycle costs made comparable

Read the story → 

Mission accomplishment rates up by over 20% in initial results

Read the story → 

Rubber or steel tracks, costed over the life cycle for six nations

Read the story → 

Where support analysis is policy,
not preference

In a growing number of defence organisations, analytical support modelling is written into how acquisition and sustainment decisions are made.

Algorithms verified; software required in evaluations

US Navy

Required in evaluations under INSTRUCTION 4441.12A

Australian Department of Defence

Analytically supported information required from suppliers

BAAINBw, German Federal Office of Bundeswehr Equipment

Adopted office-wide for life cycle cost evaluation

Used for LCM in practically all major projects

Start from the decision on the table

 

 

System design for capability and readiness

FMV Gripen reconnaissance pod · Saab Kockums A26

See these stories 

 

Inventory optimization and supply planning

Australian aviation fleet · AMDR · Air Mobility Command

See these stories 

 

Support contract management

Thales UK and the Royal Navy · Australian sovereign repair

See these stories 

 

In-service support planning

Swedish Maritime Administration SAR · Damen F126 · USAF F-15E

See these stories 

 

Life cycle cost management

BAE Systems CV90 · MKS-180 · Royal Thai Air Force

See these stories 

Different programmes, the same three lessons

 

1

Early decisions lock in most of the cost

A change made at concept stage costs little. The same change in service can cost millions. MKS-180, A26 and AMDR all put the analysis before the commitment.

2

Optimise the system, not the item

The useful question is how many aircraft are ready for take-off. AMDR, Air Mobility Command and the Royal Navy work all start there.

 
 

3

Analysis has to reach the decision

A model only matters once it changes a budget, a contract or a requirement. The Royal Thai Air Force made that structural, with LCC mandated for all major acquisitions.

Facing a similar decision?
Talk to an analyst.

Many of the organisations behind these stories have worked with Systecon for years. A conversation with the analysts closest to a similar programme is often the quickest way to tell whether a model would change the decision.